Mc-techgroup CSS-V2 Operator's manual Manuale Utente Pagina 20

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 31
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 19
20 Gas sampling and gas conditioning technology 4-1.2-ME
The hose of the condensate pump SR25.2 should be checked every six months and, if necessary,
replaced (see chapter 15.3.1);
Remove dust periodical from the cooling fins with pressure air (see chapter 15.4)
15.1 REPLACEMENT OF THE FILTER ELEMENT AND THE O-RING
NOTE!
In any case you open the filter, the filter element has to be changed.
For changing the filter element and the O-ring:
Disconnect the mains voltage;
Unscrew the filter housing cover;
Exchange the filter element and/or O-ring. Pay attention to the correct insertion of the filter
element and the O-ring (the structural surface of the filter element has to be forward turned!).
Screw down the filter housing cover again.
Figure 7 Replacement of the filter element and the O-ring
Vedere la pagina 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 30 31

Commenti su questo manuale

Nessun commento